WBHS is operating stationary heat treatment furnaces at various locations. Also, we are able to set up and operate gas-fueled or electrical on-site furnaces on short request.

Construction of Special Heat Treatment Furnaces

We constructed our furnaces according to the principle of the smallest thermical mass. Thus we are able to ensure short preat-heating phases while applying a minimum of stored energy. The most up-to date burner technologies assure low gas consumption and the lowest possible emissions.

We also specialize in modernizing exisiting systems and updating ovens with remote controlling and monitoring modules.

Information on our stationary Furnace

Delivery Times
Monday7:00 – 14:30
Tuesday7:00 – 14:30
Wednesday7:00 – 14:30
‘Thursday7:00 – 14:30
Friday7:00 – 11:00
Technical Specifications

(other sizes on request)

Dimensions (Length x Width x Heigth)5,8m x 2,8m x 2,8m
Volume45 cubic metres
Maximum Temperature800 Degree Celsius
Location / Directions

Südrandstrasse 4 | 2320 Schwechat

  • At the Highway-Crossing “Schwechat” follow the sing “S1 Graz/Linz/St. Pölten”
  • Take exit 15 / Mannswörth/ÖMS
  • Turn right twice, follow Mannswörther Street and then continue to Danubia Street.
  • Turn right into Südrandstret, passing Borealis.
  • The road takes you to “JCH” – you’ve arrived at our heat treatment site.

Send us a request!